hipsterasfolk Posted May 21, 2012 Share Posted May 21, 2012 So this has been my (almost) month long project. Still got some work to do, but the electrician has to come before I finish. Yocaseycasey ain't got nothing on me yocaseycasey 1 Quote Link to comment Share on other sites More sharing options...
Shitty Rambo Posted May 21, 2012 Share Posted May 21, 2012 What'd Casey do with all those TOYPAJ money dollars? Quote Link to comment Share on other sites More sharing options...
Daniel Dopp Posted May 21, 2012 Share Posted May 21, 2012 Which part did you do? Quote Link to comment Share on other sites More sharing options...
yocaseycasey Posted May 21, 2012 Share Posted May 21, 2012 I still have them. There's $26ish total. I'm thinking we should just donate it to aviolentworld's walk for Cystic Fibrosis. Also, I'm going to change the oil on my car today. I'm going to use a power drill. I'll post pictures after I'm successful. Quote Link to comment Share on other sites More sharing options...
patrick Posted May 21, 2012 Share Posted May 21, 2012 If you did all the work in there, it looks fantastic. I really wanted to replace the cabinets in our house, but then I got transferred for work. Probably a good thing, because I would have messed it up. Quote Link to comment Share on other sites More sharing options...
hipsterasfolk Posted May 21, 2012 Author Share Posted May 21, 2012 Nice Yocaseycasey! That is really awesome of you! Yea the cabinets were a pain in the ass, I've been to and from Home Depot like 6 times because they have me the wrong sizes for the online pickup, a damaged one that I swapped, and an incomplete cabinet. Just glad to be able to go grocery shopping again...I'm sick of Chipotle, Qdoba, Subway, etc. We did the layout, color scheme, tiling, demolition, cabinets, then had an electrician and counter tops installed for us. Wish we could f went with granite but the wait time is around 2+ weeks and we have our reunion at the house in 6 days. Now we have just enough time to buff out our damaged wood floors from the project! By doing by ourselves we saved about $10k (5.6k spent.) I'm still picking out all the dust from my nose!!! Quote Link to comment Share on other sites More sharing options...
hobohunter48 Posted May 21, 2012 Share Posted May 21, 2012 Is the title a reference to "Mics are for singing, not swinging"? Quote Link to comment Share on other sites More sharing options...
collectivemike Posted May 21, 2012 Share Posted May 21, 2012 Casey he's coming after your throne, if I were you I'd be on my way to Ohio to tear those cabinets out of the wall... in all seriousness, I really wish I had any talent in carpentry. Quote Link to comment Share on other sites More sharing options...
aviolentworld Posted May 21, 2012 Share Posted May 21, 2012 I still have them. There's $26ish total. I'm thinking we should just donate it to aviolentworld's walk for Cystic Fibrosis. not sure what this money you are talking about is for but you have done enough. also hipster that tile job is pretty kick ass. Quote Link to comment Share on other sites More sharing options...
tylerrr Posted May 22, 2012 Share Posted May 22, 2012 Have that same faucet... Nice. Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.